Surface Cleaning & Preparation

Professional Surface Cleaning & Preparation Services
The success of any pavement preservation project begins with proper surface preparation. Our professional surface cleaning services ensure your asphalt is perfectly clean and ready for sealcoating, crack filling, or striping. With 25+ years of experience, we deliver thorough cleaning that maximizes adhesion and extends pavement life.
Why Proper Cleaning Matters
A clean surface is essential for:
- Maximum Adhesion: Sealcoat bonds properly to clean surfaces
- Uniform Application: Even coverage without contaminants
- Extended Durability: Clean surfaces prevent premature failure
- Cost Savings: Proper prep reduces future repair costs
Our Professional Cleaning Methods
High-Pressure Washing
3000-4000 PSI water pressure removes dirt, debris, and loose materials
Power Sweeping
Industrial sweepers remove leaves, sand, and construction debris
Chemical Degreasing
Professional solvents break down oil, grease, and chemical stains
Power Brooming
Mechanical brushing for stubborn dirt and surface preparation
Optimal Adhesion
Clean surfaces ensure sealcoat bonds properly, preventing peeling and premature failure
Time Efficient
Industrial equipment cleans large areas quickly, minimizing property disruption
Professional Results
25+ years experience ensures thorough cleaning that meets industry standards
Versatile Applications
Suitable for all pavement types including driveways, parking lots, and commercial properties
Our Surface Cleaning Process
Initial Assessment
Evaluate surface condition, identify contaminants, and determine cleaning method
Debris Removal
Clear surface of leaves, dirt, and loose materials using power sweeping
High-Pressure Washing
Apply 3000-4000 PSI water to remove embedded dirt and surface contaminants
Stain Treatment
Apply professional degreasers to oil and chemical stains for complete removal
Final Rinse & Inspection
Thorough rinsing followed by quality inspection to ensure cleanliness
Drying Period
Allow proper drying time (24-48 hours) before proceeding with sealcoating


Frequently Asked Questions
Proper surface cleaning ensures maximum adhesion and durability of sealcoat. Dirty or oily surfaces cause sealcoat failure and reduce pavement lifespan.
We use industrial-grade equipment including 3000-4000 PSI pressure washers, power sweepers, mechanical brooms, and professional degreasing systems.
We apply professional degreasers that penetrate deep into pavement, breaking down oil molecules. High-pressure washing then removes all contaminants.
Typically 24-48 hours depending on weather. We use moisture meters to ensure surfaces are completely dry before applying sealcoat.
Spring and fall are ideal, but we work year-round as weather permits. We require temperatures above 40°F for optimal results.